Session Agenda - San Francisco, CA

 
 
San Francisco Registration
San Francisco Sponsors
San Francisco Session Agenda
San Francisco Show Schedule
Current Exhibitors
San Francisco Brochure (PDF)
Exhibitor Resources
Directions
Hotel
San Francisco Press Release

 

A few presentation slots are still available for San Francisco! If you are interested in presenting, please submit an abstract to Jim Rush: jrush@benjaminmedia.com today!

*Schedule is tentative and is subject to change

   SESSION 1: Local Leaders Forum
  8:00am - 11:00am
   
  Upper Norwest Interceptor Section 9 and NEW Project
    Bill Chavez
   

Sacramento Regional County Sanitation District

   
  Web-based GIS Integration with Sewer TV Inspection Data
    Bill Clement
    Central Contra Costa Sanitation District
   
   

San Francisco Public Utility Commission’s Planned Tunneling Works

      Norman Joyal
      Jacobs Associates
     
   

Horizontal Directional Drilling Pilot Program

      Marisa Boyce
      East Bay Municipal Utility District
     
   

Managing Wet Weather Flows in Vallejo

      Bob Hoffman
      Carollo Engineers
 
   SESSION 2: Rehabilitation Technologies
  3:00pm - 4:40pm
   
  Cured-in-Place Pipe Repair
    Jamie Quick
    Easy Liner
   
  Pipe Bursting for Main Line Replacement
    Collins Orton
    TT Technologies
   
  Grouting for Main Line Sewer Repair
    Daniel Magill
    Avanti International
   
  Root Control as Part of a Preventative Maintenance Program
    Tom Edwards and Francisco Ortega
    Duke’s Root Control
 
   SESSION 3: Inspection/Data Management
  3:00pm - 4:40pm
   
  Multiple Sensor Inspections (MSI) Utilizing a Robotic Platform Technology and Applications
   

Marilyn Shepard

   

RedZone Robotics, Inc.

   
  In-line Acoustic Leak Detection
    Myron Shenkiryk
    Pure Technologies
   
  Underground Pipeline Mapping
    Linda Ward
    Geospatial Corp.
   
 

NASSCO’s Pipeline and Manhole Assessment Certification Programs

    Marilyn Shepard
    RedZone Robotics, Inc.
 
   SESSION 4: Advanced Trenchless Technology
  8:30am - 10:10am
   
 

Hydrofracture Risks for HDD Projects

    David Bennett
    Bennett Trenchless Engineers
   
  Settlement Risks for Trenchless New Installation Projects
    Matt Wallin
    Bennett Trenchless Engineers
   
 

Design Considerations for Trenchless Projects

    Glenn Boyce
    Jacobs Associates
   
 

Case Study – HDD Ocean Outfall

    Glenn Duyvestyn
    Hatch Mott MacDonald
 
   SESSION 5: Manhole Rehab
  8:30am - 10:10am
   
 

Choosing the Right Chemical Grout for Your Application

    Ed Paradis
    de neef Construction Chemicals, Inc.
   
  Identifying Manhole I/I Sources and Cost Effective Repair Methods
    Lee Haessig
    Cretex Specialty Products
   
 

Sewer Line Root Control

   

Bill Fuller

   

Vaporooter

   
 

Lateral Connection Sealing with Chemical Grout

    Marc Anctil
    Logiball, Inc.
   
 

Twenty-first Century Solutions to Nineteenth Century Manholes

    Gary Lienberger
    AP/M Permaform
 
   SESSION 6: Inspection/Data
  2:00pm - 4:05pm
   
 

Fusible PVC for Trenchless New Installation

    Rob Craw
    Underground Solutions
   
 

Pilot Tube Microtunneling

    Robin Lorenzen
    Akkerman, Inc.
   
 

Steps to a Successful Microtunneling Project

    Glenn Duyvestyn
    Hatch Mott MacDonald
     
   

Restrained Joint PVC Pipe for HDD Applications

      John Ostermann
      CertainTeed